Forecast Evaluation
The original test data had several values that were not in line with the needed 3-minute-interval so these values had to be corrected by linear interpolation to generate equidistant testdata.
For the evaluation of the predictions the rmse between the prediction ŷ and the related test data y has been used. For the ranking of the overall submission the arithmetic mean of both quality values has been used.
Detailed Results
Please click on a row for additional information.
forecast | series 1 | series 2 | overall |
---|---|---|---|
Aranildo Lima & Fernando Nogueira |
12.4835 | 8.4918 | 10.49 |
Stephan M. Winkler | 12.7051 | 9.0776 | 10.89 |
Additional Downloads
Download the extended GECCO 2014 IC Resource Package, containing the required datasets, software, and the official rules and regulations in ZIP format. In contrast to the original resource package, this package also contains the original test data.
You can download the slides of the Industrial Challenge Results Presentation at GECCO as pdf File. The presentations of the two winning submissions are separately available. You find all additional information about the submissions in the results table above by clicking the respective row.